Cultural Resource Management

Environmental Planning

Published Aug. 1, 2018
The multi-disciplinary CRM team has knowledge and expertise to provide integrated planning support to DOD installations. Develop management plans for cultural resources and NEPA documents to assess environmental effects of military training activities and to implement master planning projects. To streamline NHPA Section 106 and NEPA processes by integrating public involvement and consultation requirements. Use programmatic approach for similar actions to avoid duplicative site-specific analyses. 

Environmental Capabilities

  • Management and sustainability planning
  • Environment compliance and documentation
  • Evaluation of military training impacts on protected resources
  • NEPA process and documentation support
  • Programmatic documents
  • Stationing Analysis (BRAC Support)

Contact

ERDCinfo@usace.army.mil, 217-373-6702

Land and Heritage Conservation Branch
Construction Engineering Research Laboratory | U.S. Army Engineer Research and Development Center


Intro to the OHWM Manual

Video by Jared Eastman
Introduction to the Interim Draft of the National Ordinary High Water Mark (OHWM) Manual
U.S. Army Corps of Engineers, Engineer Research and Development Center
Jan. 30, 2023 | 24:23
Introduction to the Interim Draft of the National Ordinary High Water Mark (OHWM) Manual for Rivers and Streams.
More