PUBLICATION NOTICE: Demonstration of Electro-Osmotic Pulse and Dehumidification Technologies to Mitigate Corrosion in Earth Covered Magazines: Final Report on Project F08-AR23

US Army Engineer Research and Development Center
Published Sept. 11, 2019

The US Army Engineer Research and Development Center has published the report/note described and linked below. Approved for public release; distribution is unlimited.

Report Number:

ERDC/CERL TR-19-17

Title:

Demonstration of Electro-Osmotic Pulse and Dehumidification Technologies to Mitigate Corrosion in Earth Covered Magazines: Final Report on Project F08-AR23

Author(s):

Michael K. McInerney, Orange S. Marshall Jr., Lawrence Clark, Christopher Olaes, Paul Noyce and Patrick Reedy

Purpose/Abstract:

The Department of Defense (DoD) maintains many earth covered magazines (ECMs) on its installations including tropical coastal marine properties. ECMs are used to store a wide variety of explosive ordnance. Coastal marine locations are exposed to extreme humidity, high rainfall, and a chloride-infused atmosphere. These conditions create a damp, highly corrosive environment inside ECMs and can severely damage the structures and their contents, and promote rapid, mold growth that is hazardous to human health. The objective of this demonstration project was to install and evaluate electro-osmotic pulse (EOP) and dehumidification (DH) technologies in an Army ECM on Guam to mitigate water intrusion and excessively high interior relative humidity (RH), respectively. The demonstration was intended to evaluate how effective this technology combination is at reducing corrosive and unhealthy conditions inside an ECM. Demonstration results were promising but mixed. The DH system held interior RH to 40%-60% while outdoor RH ranged from 85%-95%. However, the demonstration period was not long enough for the EOP system to reach equilibrium and fully stop seepage. Because the EOP success metric could not be validated for purposes of calculating the project return on investment, the reported return is based only on DH system performance.

75 pages / 3 Mb

CLASSIFICATION: UNCLASSIFIED


ERDC is a diverse research organization with approximately 2,000 employees operating more than $1 billion in world class facilities at seven laboratories. Its annual program exceeds $1 billion as it supports the Department of Defense and other agencies in military and civilian projects. Principal research areas include Soldier support, Engineered Resilient Systems, Environmental Quality and Installations, Geospatial Research and Engineering, Military Engineering, and Water Resources.  “Discover ▪ Develop ▪ Deliver” ERDCinfo@usace.army.mil