Publication Notices

Notifications of New Publications Released by ERDC

Contact Us

      

  

    866.362.3732

   601.634.2355

 

ERDC Library Catalog

Not finding what you are looking for? Search the ERDC Library Catalog

PUBLICATION NOTICE: Houston Ship Channel Expansion Channel Improvement Project (ECIP) Numerical Modeling Report

US Army Engineer Research and Development Center
Published July 8, 2019

The US Army Engineer Research and Development Center has published the report/note described and linked below. Approved for public release; distribution is unlimited.

Report Number:

ERDC/CHL TR-19-12

Title:

Houston Ship Channel Expansion Channel Improvement Project (ECIP) Numerical Modeling Report 

Author(s);

Jennifer McAlpin, Jared McKnight, and Cassandra Ross

Purpose/Abstract:

The Houston Ship Channel is one of the busiest deep-draft navigation channels in the United States and must be able to accommodate larger vessel dimensions over time. The U.S. Army Engineer District, Galveston (SWG), requested the U.S. Army Engineer Research and Development Center, Coastal and Hydraulics Laboratory, perform hydrodynamic and sediment modeling of proposed modifications along the Houston Ship Channel from its connection to the Gulf of Mexico to the Port of Houston. The modeling results are necessary to provide data for salinity and sediment transport analysis as well as ship simulation studies. SWG provided a project alternative that includes channel widening, deepening, and bend easing. The model is run for present year zero (2029) and future year 50 (2079) with and without project. The model shows that the salinity does not vary greatly with project. Changes to salinity are 2 parts per thousand or less. The tidal prism increases by less than 2% when the project is included, and the tidal amplitudes increase by no more than 0.01 meter. The residual velocity vectors do vary in and around areas where project modifications are made - along the Houston Ship Channel, Bayport Channel, and Barbours Cut Channel. The model also indicates an increase in the shoaling along the ship channel when compared to the without project results, the largest increases being in the Bayport channel and flare.

136 pgs / 22 mb

CLASSIFICATION: UNCLASSIFIED


ERDC is a diverse research organization with approximately 2,000 employees operating more than $1 billion in world class facilities at seven laboratories. Its annual program exceeds $1 billion as it supports the Department of Defense and other agencies in military and civilian projects. Principal research areas include Soldier support, Engineered Resilient Systems, Environmental Quality and Installations, Geospatial Research and Engineering, Military Engineering, and Water Resources. “Discover ▪ Develop ▪ Deliver”   ERDCinfo@usace.army.mil


Contact
ERDC Library
601-634-2355
erdclibrary@ask-a-librarian.info

Release no. 19-022