Publication Notices

Notifications of New Publications Released by ERDC

Contact Us

      

  

    866.362.3732

   601.634.2355

 

ERDC Library Catalog

Not finding what you are looking for? Search the ERDC Library Catalog

Results:
Tag: Work rates
Clear
  • Ice Cutting and Removal for Cold Weather Improved Ribbon Bridge (IRB) Crossings

    Frozen rivers provide an obstacle for any military force, as ice impedes the use of Improved Ribbon Bridges (IRBs) or other bridging vehicles. Finding an efficient way to cut and remove ice to allow for the emplacement of bridging assets is critical. The US Army Cold Regions Research and Engineering Laboratory’s (CRREL) Cold Weather IRB team went to Camp Grafton, North Dakota, to collect data for the North Dakota National Guard who were conducting a frozen wet gap crossing in February of 2022. Both quantitative and qualitative data were collected to evaluate strategies for ice cutting, removal, and IRB placement. After ice cutting and removal, an IRB bay was successfully placed in the frozen pond. Laboratory tests were conducted in March 2022 to examine different chainsaw chains for cutting an ice sheet grown in the Geophysical Research Facility (GRF) at CRREL. Chainsaws were determined to be an effective tool for cutting ice, and the speed and comfortability of different chains were documented. The data collected from this project will help to drive the North Dakota National Guard creation of a winter bridging course and will be used to update the Army’s Tactics Techniques and Procedures (TTPs) for cold weather bridging operations.