Gridded Surface Subsurface Hydrologic Analysis
A map of the cell by cell flood depth differences from the existing flood depth to the flood depth for the proposed changes for the Picayune Strand study. The team recommended shortening a proposed levee. All of the proposed changes saved $40M for the project.