Building Information Modeling becomes everyday business
Figure 2. In BIM modeling of the ERDC headquarters building there is not just one model created by the Yates Construction team, but several that are integrated into a composite master model. Each discipline including structural engineering, mechanical, electrical and plumbing engineering creates a model independently of all the others, based upon the Mobile District’s original contract plan set, which is the starting point.

Download Image: Full Size (0.18 MB)
Photo by: Johnny Jaccuzzo |  VIRIN: 150214-A-YQ899-002.JPG