140606-A-CE999-015
The photo depicts the mudslide area (tan color), the village and the modeled reservoir (in red, green and blue). The HEC-HMS model was used to predict, if nothing was done, the water would overtop the mudslide on or about June 4.

Download Image: Full Size (0.16 MB)
Tags:
Photo by: U.S. Army Corps of Engineers |  VIRIN: 140606-A-CE999-015.JPG