US Army Corps of Engineers
Engineer Research and Development Center Website

EDYS
EDYS simulations at Cibolo Creek established the existing hydrologic, engineering, economic, and environmental conditions of the floodplain and surrounding areas and helped to create a plan that reduced flood damage and increased base flow stability.

Download Image: Full Size (0.27 MB)
Tags: ERDC EL, EDYS
Photo by: ERDC |  VIRIN: 120726-A-HE390-008.JPG