EDYS
EDYS simulations at Cibolo Creek established the existing hydrologic, engineering, economic, and environmental conditions of the floodplain and surrounding areas and helped to create a plan that reduced flood damage and increased base flow stability.

Download Image: Full Size (0.27 MB)
Tags: ERDC EL, EDYS
Photo by: ERDC |  VIRIN: 120726-A-HE390-008.JPG