Potential Lock Operations Management Application (LOMA) Hardware Installation Sites along the Ohio River to Improve Automatic Identification System (AIS) Reception and Transmit Range

Published Feb. 28, 2024

Vicksburg, Miss. --

Link: http://dx.doi.org/10.21079/11681/48253

Report Number: ERDC/CHL CHETN-IX-68

Title: Potential Lock Operations Management Application (LOMA) Hardware Installation Sites along the Ohio River to Improve Automatic Identification System (AIS) Reception and Transmit Range

By: James T. Kilroy, Marin M. Kress, Brady A. Towne, and Kenneth W. Swan

Distribution Statement A. Approved for public release: distribution is unlimited.

February 2024

7 pages / 1.78 Mb

Contact
ERDC Library
601-634-2355
erdclibrary@chat.libraryh3lp.com

Release no. 24-039