Results:
Tag: Locks (Hydraulic engineering)--Maintenance and repair
Clear
  • Finite element analysis of quoin block deterioration and load transfer mechanisms in miter gates: pintle and pintle connections

    Abstract: The U.S. Army Corps of Engineers (USACE) currently operates and maintains approximately 193 commercially active lock sites with 239 locks and dams spanning nearly 12,000 miles. These networks of water channels are used to transport 600 million tons of domestic cargo, generating $405 billion in revenue annually. Nearly 60% of these structures in operation are over 50 years old and have reached design life. A failure of the miter gates could result in a major negative impact on the economy and on the ability to maintain flood control. Administrators need recommendations to better prioritize maintenance and repair of the USACE miter gates. This work investigated the influence of miter gate’s quoin block degradation on load transfer to the pintle and/or pintle connections. Results of finite element analysis are reported for the quoin block degradation simulated levels of 0%, 25%, 50%, and 75%. The parametric study shows the overstressed regions are the pintle neck and bolt-hole regions. To improve pintle designs so they may better mitigate detrimental environmental based deterioration effects, this work recommends (1) increasing the thickness of the bolt-hole connection region and (2) adding ribbing reinforcement around the neck area of the pintle.
  • Lock Operation Improvements

    Abstract: The U.S. Army Corps of Engineers (USACE) owns or operates 236 locks at 191 sites (HQUSACE 2016). Although the locks at these sites generally perform reliably, more than half of these structures have surpassed their 50-year economic design life and as such, there are increasing concerns about their continued safe, reliable operation. This work was undertaken to review lock operating equipment, maintenance practices, records pertaining to accidents and equipment failures, and lighting systems; to identify alternative improvements to equipment and equipment maintenance practices; and to analyze and compare those alternatives to determine and recommend optimal solutions. This report documents some lessons learned, primarily to share information that others might find useful. Note that the recommendations in this report should not be viewed as policy, although some might be considered by those creating policy.