Results:
Tag: runway
Clear
  • December

    Joint project develops airfield damage repair materials, techniques

    Wanted: Airfield Damage Repair material, equipment and procedures to repair runways used by U.S. Air Force (USAF) fighter jets and cargo planes. The goal is to repair 120 craters in 6.5 hours using up to eight teams.
  • 11-Step program repairs airfield damage

    The U.S. Air Force (USAF) is seeking technologies to repair 120 airfield craters in 6.5 hours using eight repair teams. Researchers with ERDC’s Geotechnical and Structures Laboratory (GSL) are currently working with the Air Force Research Laboratory and the U.S. Air Force Civil Engineer Center to develop the materials and techniques, tactics and procedures (TTP) to reach that goal.